Silversea Cruises - Silver Spirit
Assignment: Executive and construction design. Survey during Main Atrium basin
The ship was lengthened during the dock by about 20m, the Main Atrium was entirely involved in the works. From the general project, all the drawings necessary for the approval of the shipping company and the companies for the construction of the artifacts were developed. Lastly, the fitting out work on board during the dock was coordinated, giving assistance to the company responsible for the assembly and coordinating with the customer. Lengthening Fincantieri Palermo.
Client
De Wave Group
Project date
2018
Category
Ship Design